prés verts

vue intérieure en clt
façade en bois
escalier

dismantling of three container school buildings and construction of two new buildings for a kindergarten and primary school

Programme

éducation, public

Location

Jette

Date

2019

- 2023

Surface construction

1380 sq m

Surface external areas

1250 sq m

Budget HTVA

 2.063.000 €

Status

built

Client

Comité Scolaire Notre-Dame de Lourdes asbl

Architect

atelier 229

The obsolete school buildings have been replaced by two modern constructions for kindergarten and primary education, designed to accommodate up to 240 students and 14 staff members. These new spaces prioritize natural light, flexibility, and versatility while meeting the current needs of the school.

Space Optimization

Versatility

Integration with Nature

Materials and Identity

Team